Dongguan Yijun wire Co., Ltd
Tel: 0769-85715537
Fax: 0769-85257572
E-mail: e-jun@e-jun.cn
Address: no.37-39, longan 2nd Road, longan community, Humen Town, Dongguan City
Business:
Wang Wenming 136 0027 7285
Email e-jun@vip.163.com
Zhang Hui 135 5667 2877
Email hui@e-jun.cn
Wang Wenjian: 131 6899 3399
Email jian@e-jun.cn
He Renxian: 188 2683 7491
Email xian@e-jun.cn
The sampling batch is set as one sample per 20kmul extension line. If there are unqualified items in the sample, double quantity shall be selected to recheck the unqualified items. If there are still unqualified items, 100% inspection shall be carried out.
Preparation before production
1.1 clear the production task and lead the standard insulated core.
1.2 change the pitch according to the requirements of process card.
1.3 clear the obstacles around the cable laying machine.
2 operation requirements
2.1 it is necessary for the operator to know the outer diameter and structure size of various standard insulation cores.
2.2 during the operation, it is necessary to lay the wires evenly, and adhere to a certain expansion force, so as to prevent the wire core from being loose, disordered and broken on the cable laying machine.
2.3 install two, three or four different colors of reels on the UL extension cord plug of the cable laying machine, and install the take-up reel on the shaft in the winding direction.
2.4 assemble the cable core and pass through the shaft hole of the cable laying machine.
2.5 when cable is finished, it is necessary to check the pitch of cable before it can be put into production.
2.6 after the insulation is stripped off, one half of the conductor shall be cut off and wrapped tightly. The joint shall not be larger than the outer diameter of the cable, and the joint shall be marked